Naval has gedilpomeerd employ staff who are specialized in making security plans for all types of vessels and in all common class offices

Firefighting & safety plans

Regulations:

Example security fishing vessel all ships are required to have on board at least three security plans. The plan must be permanently affixed to a central location.

Two security plans are arranged next to the bridge house and prominently marked in tight waterproof containers
Plans must be kept up-to-date.
The requirement of firefighting and security are covered by the International Convention for the Safety of Life at Sea (SOLAS) 1972, including amendments.

What methods are available for up-to-date making your fire & safety plans?

A) From an existing hardcopy / paper General Plan of the ship.

Converting a paper copy to a digital plan
Visit to board the vessel for receiving the location of the various fire and safety means
The application of the symbols in the new general plan
Making of a legend, all in accordance with the required class etc ...
If desired, submit to class

B) Conversion of an old paper and fire safety plan.

if paper copies, see A1
Visit to board the vessel for receiving the location of the various fire and safety means
The application of the symbols in the new general plan
Making of a legend all in accordance with the required class etc ...
If desired, submit to class

C) From an existing computer / digital plan.

If there is a digital file is present, this will lead to time and cost savings (s).
Visit to board the vessel for receiving the location of the various fire and safety means
The application of the symbols in the new general plan
Making of a legend all in accordance with the required class etc ...
If desired, submit to class

Additional service:

We provide for an additional charge to the finished lamination plans and / or supply containers which are watertight protection on board the ship.

Exclusive: putting on board the ship

What does our service?

Our standard offer includes the production of a complete new drawing. Afterwards a draft copy will be presented to you. After your approval, we will send it on to the Classification Society. If this approval is granted, the final prints are produced on board the ship.

1. 3x print copy of the approved
2. Additional copies can be supplied at extra cost for office or training purposes.
3rd class costs for the client

What is the timetable for a Safety Plan?

  1. that depends on the schedule of both you, as our office
  2. Furthermore, much depends on the complexity of the vessel and the quality of the original material that you provide.
  3. Average starting date will ship pre design will take 4-6 days working days.

For which ships we make safety plans?

  • trawlers
  • fishing Vessels
  • Guard Vessels
  • Fast rescue vessels
  • tugs
  • Excursion boats
  • Pleasure craft (professional)


For which flag states we create safety plans?

  • Netherlands
  • England
  • Germany
  • Belgium
  • Denmark
  • Norway
  • France
  • Cyprus

If your flag is not listed? Do not hesitate to contact us.